Friday, June 15, 2012
The Ranch, Lakewood, New Mexico 68 degrees and partly sunny to 105 degrees and sunny.
Gas line trench
Digging, never had this many digging projects this close together, water stand pipes, for the new laundry water, propane gas and electric to the building. In the near future there will be waist water line to dig and install. Just need to complete the water in trench for now. Electric is done and back fill is in work.
Electric wire trench
Part of our Wednesday order arrived, wood for the outside deck, paneling for the inside walls and insulation. Installation of the insulation can start now. Electric power is on in the building with the air conditioner operating. And another circuit is powered to operate tools. Wednesday the electrician will be back to connect more circuits and lights.
No comments:
Post a Comment