Wednesday, August 8, 2012

The Original Ranch, Lakewood, NM - cut wood

Tuesday, August 7, 2012
The Original Ranch, Lakewood, New Mexico 74 degrees (for a short time) and mostly cloudy to 104 degrees and mostly sunny.
Plywood is cut and laying on the platform
Mens coffee, I went to Artesia for the doughnuts that we have with coffee and water committee meeting after that, not many here for the water committee and that was over early so back to work.

Baseboard molding is installed and tools and supplies
Richard and I cut the plywood for the washing machine platform, we cut and installed white wall board for the top of the pipe chase area and installed the baseboard molding in southwest end of the building. Jerry continued the trench for the sewer connection. We then moved the accumulated tools and supplies from the east side of the door to the west side of the door, and we layed out the baseboard for the east end of the building, some things did not make it past the door. Those things are no longer needed in the building so out the door they went.


White board installed on top front of pipe chase


Baseboard molding layed out for installation

At four o'clock Bonnie and I went to happy hour at the ranch house.

Sewer pipe trench




No comments:

Post a Comment