The Original Ranch, Lakewood, New Mexico 70 degrees (for a short time) and mostly cloudy to 107 degrees sunny.
Cortez propane gas arrived with tank and workers to pipe in the propane to our hot water heaters and gas dryers. The laundry dryers and hot water heaters are shutdown (old building) for now as the pressure regulator was moved to the new building. We will get two dryers moved and operating soon in the new building. (To enlarge pictures; Click on picture to enlarge, click on the X in the upper right to return to the blog).
The top of the pipe chase area was installed today and the fascia will be the white material held in the picture. We continued to remove construction and waste items from the room in preparation for putting down the floor tile in the main area. We place some floor tiles down to visualize the layout and to decide where we will start the installation. Only the waste water line needs to be completed in the pipe chase area.
Floor tile |
New propane Tank |
At four o'clock Bonnie and I went to happy hour at the ranch house.
No comments:
Post a Comment