Richard and I installed flooring today, one hundred and twelve square feet of three hundred and sixty square feet with Wally’s help.
Richard hard at work |
The plumbing in the bathroom is complete except for the toilet connection to freshwater
The Tee fitting in the lower left now has a shutoff valve |
and we will wet the pipes in the morning for a leak test of cold and hot water pipes inside the building.
At four o'clock I went to happy hour at the ranch house. After dinner I got this picture at sunset.
No comments:
Post a Comment